850-222-2SDR
skip to the main content area of this page
Bridge Design


Representative Projects:

The SDR Engineering staff has been responsible for designing and detailing bridges in accordance with the AASHTO Bridge Codes, Ontario Bridge Code, Florida DOT and Texas DOT design criteria and specifications. The bridges designed by SDR Engineering also meet Federal Highway Administration (FHWA) criteria for bridge design and construction. SDR Engineering employees are experts on concrete segmental bridges, cable-stayed bridges, major steel bridges and seismic design requirements.


Bahia Honda Key, FL
Bahia Honda Bridge Rehabilitation

SDR Engineering, Inc. designed the repairs to meet the specifications of the Florida DOT on the current 6,700-foot bridge in the Florida Keys using Fiber Reinforced Polymer (FRP) repair techniques on the pre-stressed concrete pile bents.


Lee County, FL
SR-45 Bridge Over Spring Creek

Our staff designed the widening of an existing pre-stressed concrete voided flat slab bridge. We also developed conceptual studies and implemented a unique superstructure design utilizing pre-stressed concrete solid slabs with cast-in-place structural overlay to eliminate the need for transverse post-tensioning on the widened portion. SDR Engineering, Inc. was also responsible for preparing contract plans, quantities and specifications.


North Palm Beach, FL
MacArthur Park Pedestrian Bridge

For this 1,400-foot long timber truss bridge with pre-cast/pre-stressed concrete pile bentsour engineers utilized “build from the top?design and construction erection techniques with 40-foot spans in order to protect the sensitive environment and to satisfy the aesthetic requirements.


Pasco County, FL
SR-56 Bridge Over I-75

span lengths of 160-feet, the longest span of this type in Florida. Our staff was responsible for all tasks, including all superstructure and substructure design and detail.


Tallahassee, FL
Park Avenue Bridge Over CSX Railroad

This unique superstructure was designed utilizing pre-stressed concrete solid slabs with a cast-in-place deck. The slabs were then post-tensioned longitudinally in order to obtain the shallowest bridge depth possible due to roadway profile grade and vertical clearance restrictions.


Tallahassee, FL
Texas Street and Gaines Street Bridges

This unique superstructure was designed by SDR engineers utilizing pre-cast and pre-stressed “Double-Tee?units for the first time in the State of Florida. These units were then post-tensioned transversely for deck strengthening. These bridges serve as models for the FDOT Standard Details subsequently developed.


Tampa, FL
Harbour Island East Access Bridge

The Harbour Island East Access Bridge is an AASHTO Type IV bridge that uses pre-stressed concrete girders with pile bents. Using complex geometry, our staff designed an 800 foot long continuous bridge deck with expansion joints only at the abutments.


Boston, MA
Central Artery, I-93/I-90 Interchanges

The I-93/I90 Interchanges in Boston Massachusetts were designed by SDR engineers. These Segmental concrete box girder bridges were constructed by the balance cantilever method. The interchanges have a viaduct that is 2,027 feet in length, four ramps constructed vary in length from 425 feet to 1,411 feet, and a substructure consisting of a combination of straddle bents with integral pier segments and single pier segments.


Middlesex County, NJ
Driscoll Bridge Over Raritan River

The design for widening and rehabilitation of a segmental bridge on the Garden State Parkway was completed by SDR Engineering, Inc. We also performed various designs including transverse analysis of the superstructure, longitudinal flexural analysis, column design, seismic design, bearing design, abutment design, design of drilled shaft and pile foundations, and preparation of contract plans. The bridge has 21 spans in four superstructure units. (Note: The Steel Plate Girder Alternate was the low bid for construction.)


Middlesex County, NJ
Edison Bridge Over Raritan River

SDR Engineers designed the widening and rehabilitation of the Edison Bridge o over the Raritan River which is a steel and concrete girder bridge. We performed tasks including column design, seismic design, bearing design, abutment design, and design of pile foundations. This project was a Design/Build Contract.


Puerto Rico
Tren Urbano Railway Bridges

SDR Engineering, Inc. designed a segmental railway bridge system in Puerto Rico with single and dual track box girders constructed by using span-by-span construction methods. We also checked the seismic analysis on the substructure for replacing skewed straddle bents by single column with semi-circular ends.


Austin, TX
Texas SH 130, Turnpike Corridor

SDR staff designed the bridge standardization to streamline over 120 bridges for the new 94-mile long turnpike corridor. Our studies included foundation and superstructure design for various types of bridge configurations. Superstructure types that were used included standard AASHTO and Modified Bulb-Tee pre-stressed concrete girders and structural steel girders. Substructure types included drilled shaft foundations and straddle bents.




Design Review

In addition to performing bridge designs and detailing as noted above, SDR Engineering staff has served as Design Review Consultants to Florida DOT. Structural analyses and plan reviews were performed for projects such as:


Eastpoint to Apalachicola, FL
Apalachicola Bay/River Bridges / US-98

SDR Engineers performed complete design analysis and plan review of the post-tensioned concrete segmental box girder alternate on the Apalachicola Bay Bridge. Our staff utilized time-dependent analysis computer programs for design verification and our construction methods used span-by-span and “propped cantilever?techniques. (Note: The Bulb-Tee Concrete Girder Alternate was the low bid for construction.)


Ft. Lauderdale, FL
Ft. Lauderdale-Hollywood Airport / US-1

These four ramp bridges of pre-cast concrete, post-tensioned segmental box girders were designed by our engineers. We were responsible for reviewing and approval of

  • all shop drawings
  • reinforcing steel
  • post-tensioning materials/placement/tendon stressing/grouting
  • pot bearings
  • expansion joints
  • casting curves
  • erection manuals
  • erection equipment
  • erection procedures;instrumental in coordinating changed construction sequencing due to railroad requirements, modifications to the contract plans, communicating with the Contractor, the Subcontractors and the Specialty Engineer, and casting of the segments.

Ft. Lauderdale, FL
I-595 Interchange Segmental Bridges

SDR Engineering performed design verification of post-tensioned anchorage zone reinforcing, concrete box girder reinforcing, construction techniques and repair procedures.


St. Petersburg, FL
Sunshine Skyway Bridge / I-275

SDR Engineers performed a review of a post-tensioning anchorage zone reinforcing, cable-stay anchor block reinforcing and construction loads verification.


The SDR staff stands ready to provide the client with the best possible bridge design services available.


Back to top