I-10 AT HIGH RISE BRIDGE

A portion of the I-10 at High Rise Bridge (Louisiana) experienced severe fire damage to many critical bridge elements, including prestressed girders, diaphragms, bearing pads, bridge deck, and substructure. SDR was tasked with assessing the extent of the damage, providing construction support, and creating a plan of repair by utilizing CFRP to rehabilitate the high-traffic-volume bridge and ensure long-term durability.

Related Works